Ongoing projects
PROJECT TITLE : PROPOSED CONSTRUCTION AND COMPLETION OF ROAD UPGRADING AND ASSOCIATED WORKS ALONG JALAN DUTAMAS 2, MUKIM BATU, BANDARAYA KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. (DRAINAGE)
CLIENT : SUHATI SDN BHD
TYPE OF METHOD : MANSHIELD & SLURRY METHOD
PIPE SIZE : 1800MM & 3600MM DIAMETER
PROJECT TITLE : CONTSRUCTION AND COMPLETION OF GUIDEWAY, STATIONS, PARK AND RIDE, ANCILLARY BUILDINGS AND OTHER ASSOCIATED WORKS FOR PACKAGE GS06 FOR LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA - LRT3-GS06
CLIENT : SUNWAY CONSTRUCTION SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 300MM DIAMETER
PROJECT TITLE : CONSTRUCTION AND COMPLETION OF REMAINING SITE CLEARING, EARTHWORKS, RETAINING STRUCTURE, MAIN DRAIN AND ASSOCIATED INFRASTRUCTURE WORKS DI ATAS LOT PT 47384 DAN PT 47385, MUKIM SEMENYIH, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN SETIA ALAMSARI SDN BHD
CLIENT : LANDHON BUILDERS SDN BHD
TYPE OF METHOD : MANSHIELD METHOD
PIPE SIZE : 2100MM DIAMETER
PROJECT TITLE : LOCAL AND COMMON INFRASTRUCTURE WORKS FOR CADANAGAN MEMBINA 262 UNIT RUMAH TERES 2 TINGKAT (FASA 1A) DI ATAS LOT PT 4792, BANDAR BARU SALAK TINGGI, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK TETUAN OASIS GARDEN DEVELOPMENT SDN BHD (M SENYUM - PRIORITY AREA & PHASE 1A)
CLIENT : BINA STL SDN BHD
TYPE OF METHOD : MANSHIELD METHOD
PIPE SIZE : 1050MM DIAMETER
PROJECT TITLE : THE PROPOSED CONSTRUCTION AND COMPLETION OF 10 LEVELS OF PODIUM COMPRISING OF 8 LEVELS OF CARPARK, M&E SERVICES, 3 LEVELS OF RETAILS, EXTERNAL WORKS AND WORK OUTSIDE BOUNDARIES (PACKAGE 2) FOR THE PROPOSED TRANSIT ORIENTED DEVELOPMENT AT PLOT 7MD7, PRECINT 7, PUTRAJAYA
CLIENT : PEMBINAAN MITRAJAYA SDN BHD
TYPE OF METHOD : MANSHIELD METHOD
PIPE SIZE : 750MM DIAMETER
PROJECT TITLE : CADANGAN MEMPERTINGKATKAN SISTEM PERPARITAN INDUK UNTUK MENGATASI BANJIR KILAT DI JALAN TERKUKUR DAN SEKITARNYA, TAMAN MILLION, KUALA LUMPUR
CLIENT : ZUMATEX ENGINEERING SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 1500MM DIAMETER
PROJECT TITLE : NOMINATED SUB-CONTRACT FOR PIPE JACKING WORKS FOR CADANGAN PAIP AIR UTAMA DARI TANGKI IMBANG BUKIT ENGGANG, LOJI RAWATAN AIR LANGAT 2 KE SAMBUNGAN PAIP DI JALAN BARU, PEKAN KAJANG DI MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. FASA 2 - PAKEJ 2 (JALAN SUNGAI LONG TO JALAN S.M.A.P)
CLIENT : SUHATI SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 2400MM DIAMETER
PROJECT TITLE : RANGKAIAN PAIP PEMBENTUNGAN DI BAYAN BARU, PULAU PINANG (FASA 2)
CLIENT : WARAS MEGAH SDN BHD
TYPE OF METHOD : MANSHIELD & SLURRY METHOD
PIPE SIZE : 1800MM DIAMETER
PROJECT TITLE : CADANGAN KERJA-KERJA PENYAMBUNGAN PAIP AIR SECARA PIPE JACKING UNTUK RANCANGAN PERUSAHAAN DI ATAS LOT PT 24433 (BLOCK 6), LOT 63625 & PT 63626 (BLOCK 13) DAN LOT 24439 (BLOCK 12) (JUMLAH 1,079.00 EKAR), MUKIM KAPAR, DAERAH KLANG, SELANGOR DARUL EHSAN - S142
CLIENT : ALPHAPRISE SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 750MM DIAMETER
PROJECT TITLE : PROPOSED CONSTRUCTION, TESTING & COMMISIONING AND HANDOVER SEWERAGE RETICULATION WORKS AND OTHER RELATED WORKS FOR MIXED DEVELOPMENT AT PRECINT 1 ON PART OF PT 3862, MUKIM IJOK, DAERAH SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN PARAGON PINNACLE SDN BHD S147
CLIENT : LGG CONSTRUCTION SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 300MM DIAMETER
PROJECT TITLE : CADANGAN BAGI MEMBINA BAGI PEMBANGUNAN BERCAMPUR DIATAS LOT 482729 (PT9749), JALAN SUNGAI BESI, SALAK SELATAN, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN FITRAH RESOURCES SDN BHD S149
CLIENT : ENVITECH SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 1350MM DIAMETER
PROJECT TITLE : PROPOSED CONSTRUCTION AND COMPLETION OF 0.77ML SUCTION TANK, PUMP HOUSE AND MAIN WATER RETICULATION WORK FROM DUSUN KUBUNG WATER TANK TO SETIA ECO TEMPLER DEVELOPMENT AT LOT 614 AND LOT 11, PEKAN TEMPLER, DAERAH GOMBAK, SELANGOR DARUL EHSAN FOR MESSRS SETIA ECO TEMPLER SDN BHD - S134
CLIENT : WILAJAYA SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 600MM DIAMETER
PROJECT TITLE : CADANGAN BEKALAN AIR BERSEPADU (IWSS) KEPONG ESTATE 1 UNTUK PEMAJUAN :- (A) TETUAN MEGA LEGACY (M) SDN BHD (B) TETUAN LAKECITY KL NORTH SDN BHD (C ) TETUAN UTTARA LAND SDN BHD (D) TETUAN PENGURUSAN AIR SELANGOR SDN BHD. MUKIM BATU, WILAYAH PERSEKUTUAN KUALA LUMPUR - S137
CLIENT : SUHATI SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 400MM, 700MM & 1200MM
PROJECT TITLE : CADANGAN PEMBANGUNAN BAGI : 1) 1 BLOK PANGSAPURI 20 TINGKAT (382 UNIT) DI ATAS 5 TINGKAT PODIUM TEMPAT LETAK KERETA BESERTA KEMUDAHAN PENDUDUK DI ATAS LOT HS (D) 322613 PT 6699, JALAN PJS 1/52, PETALING UTAMA, PJS 1, BANDAR PETALING JAYA SELATAN, DAERAH PETALING, SELANGOR 2) 1 BLOK RUMAH SELANGORKU 12 TINGKAT (249 UNIT) DENGAN TEMPAT LETAK KERETA TERBUKA BESERTA KEMUDAHAN PENDUDUK DI ATA LOT HS (D) 322614 PT 6700 JALAN PJS 1/56, PETALING UTAMA, PJS 1, BANDAR PETALING JAYA SELATAN, DAERAH PETALING, SELANGOR. S145
CLIENT : BENUA KONSULT SDN BHD
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 300MM DIAMETER
PROJECT TITLE : PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR DAN PUTRAJAYA FOR YEAR 2019 - PACKAGE 17 (HULU LANGAT AND SEPANG REGION)
CLIENT :SIAK SIONG ENGINEERING SDN BHD S151
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE : 450MM DIAMETER
PROJECT TITLE : CADANGAN MENAMBAIK SISTEM AGIHAN DI PARIT MARKOM & BENUT DI DAERAH PONTIAN, KG MAJU JAYA DI DAERAH JOHOR BAHRU, PASIR GOGOK DI DAERAH KOTA TINGGI DAN CADANGAN, MEMBAIKPULIH TANGKI LARKIN PERDANA DI DAERAH JOHOR BAHRU PAKEJ 2 CADANGAN MENAMBAHBAIKAN SISTEM AGIHAN DI KG MAJU JAYA, JOHOR BAHRU DAN PARIT MARKOM, PONTIANM
CLIENT : ASIA BARU CONSTRUCTION SDN BHD S202(a)/23
TYPE OF METHOD : SLURRY & MANSHIELD METHOD
PIPE SIZE : 450MM, 600MM & 1200MM DIAMETER
CLIENT : RENEUCO ENGINEERING SDN BHD. S152(a)/23
TYPE OF METHOD : Slurry, Manhole, Utility Mapping & Dilapidation Survey
PIPE SIZE : 300MM DIAMETER
PROJECT TITLE : KERJA-KERJA MENAIKTARAF SYSTEM SALIRAN DI TAMAN MELAWIS, DAERAH KLNAG, SELANGOR DARUL EHSAN
CLIENT : MAJU MULIA SDN BHD S154
TYPE OF METHOD : SLURRY METHOD
PIPE SIZE :
PROJECT TITLE : CADANGAN PINDAAN PELAN YANG TELAH DILULUSKAN PADA TARIKH 8HB JUN 2015 NO. FAIL BP S1 OSC 2015 0697 DI ATAS SEBAHAGIAN LOT PT 27, SEKSYEN 95 (REZAB PERSEKUTUAN 166, NO. SIRI 3031), JALAN ANG SENG 6, PERSEKUTUAN KUALA LUMPUR UNTUK TETUAB PEBADANAN PR1MA MALAYSIA
CLIENT : TTC JAYA SDN BHD M203
TYPE OF METHOD : MANSHIELD METHOD
PIPE SIZE : 750MM DIAMETER
PROJECT TITLE : EXECUTION AND COMPLETION OF MAIN BUILDING WORKS FOR CADANGAN MEMBINA 2 BLOK PANGSAPURI YANG MENGANDUNGI (39-40 TINGKAT) 226 UNIT TERMASUK 1 TINGKAT KEMUDAHAN DI ATAS 8 TINGKAT PODIUM YANG MENGANDUNGI TEMPAT LETAK KERETA DAN KEMUDAHAN DI ATAS LOT 89553 (LOT LAMA PT423), PERSIARAN TROPICANA, MUKIM BANDAR DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK TETUAN ONE RESIDENCE SDN BHD M204
CLIENT : EDLAMB CONSTRUCTION SDN BHD
TYPE OF METHOD : MANSHIELD METHOD
PIPE SIZE : 900MM DIAMETER
PROJECT TITLE : PROPOSED DEVELOPMENT OF S. RASAU WATER SUPPLY SCHEME (STAGE 1) SELANGOR DARUL EHSAN.
PACKAGE 2 - DESIGN AND BUILD OF PROPOSED RASAU TREATED WATER PUMPING STATION, TREATED WATER PUMPING MAINS TO EXISTING BUKIT LIPAT KAJANG RESERVOIRS, DISTRIBUTION AND ASSOCIATED WORKS MS205
CLIENT : TALIWORKS CONSTRUCTION SDN BHD
TYPE OF METHOD : SLURRY & MANSIELD METHOD
PIPE SIZE : 2100MM DIAMETER